Skip to content
Friday 8 May 2026
  • Home
  • Advertise with us
  • Contact
The Frontier
Click to read
The Frontier
  • News
  • Crime
  • Politics
  • Headlines
  • Education
  • Health
  • Business & Economy
  • Sports
  • More
    • International
    • Religion
    • Entertainment
    • Info Tech
    • Matilda Showbiz
      • Gists
      • Music
      • Gossips
      • Oga MAT
      • Romance
    • Arts & Culture
    • Environment
    • Opinion
    • Features
    • Epistles of Anthony Kila
    • EyeCare with Dr Priscilia Imade
The Frontier
  • News
  • Crime
  • Politics
  • Religion
  • Headlines
  • Education
  • International
  • Business & Economy
  • Entertainment
  • Sports
  • Arts & Culture
  • Environment
  • Health
  • Matilda Showbiz
    • Gists
    • Music
    • Gossips
    • Oga MAT
    • Romance
  • Opinion
  • Epistles of Anthony Kila
  • EyeCare with Dr Priscilia Imade
  • Info Tech
  • Interview
The Frontier
Click to read
Special
Special

RUNWAY NIGHTMARES: What happened to billions spent on Enugu Airport in 16 years?

The FrontierThe FrontierApril 26, 2025 3386 Minutes read0

Akanu Ibiam International Airport in Enugu is in the news, although for wrong reasons. Two connected issues have brought the Emene-based airport into public glare in recent days: its never-ending runway problems and a controversial claim about plans to concession the facility for 80 years.

Although the Minister of Aviation and Aerospace Development, Mr Festus Keyamo, had since dismissed the latter as untrue, the unresolved runway problems continue to leave industry stakeholders and Nigerians confused, reports Saturday Vanguard.

In fact, their frustrations, deepened by recent closure of the airport by the Federal Government, have stirred up a hornets’ nest of criticism and renewed calls for accountability.

Runway closure

A few hours after Nigeria’s largest flag carrier, Air Peace, suspended operations to Enugu over safety concerns of its runway, other airlines followed suit.

In fact, less than 24 hours after the airline made the announcement, the Federal Airports Authority of Nigeria, FAAN, temporarily closed the airport for runway rehabilitation.

FAAN disclosed that there was a significant rupture in the asphalt surface at a critical section of the runway that would require emergency repairs.

The agency, in a statement by the Director of Public Affairs and Consumer Protection, Mrs Obiageli Orah, stated that the repairs would be conducted on that portion of the runway from April 22 to May 6, 2025.

Adding his voice to the matter, Keyamo, via his X handle, also recalled that a similar development led to the closure of the runway in August 2019 for one year and the contract for the total rehabilitation was awarded to a contractor.

He stated: “Unfortunately, when we came to office, we discovered that a waterlogged part of the runway was not properly constructed to take care of the problem, leading to constant cracks and potholes on the runway.

“It obviously puts the lives of the travelling public at great risk. We have been carrying out constant palliative works on it, but the problem has not abated and the cracks on the runway are becoming craters. I personally visited the airport some months after assuming office and expressed my total displeasure with the work done by the contractor.”

Frequent runway repairs without permanent solution

Within 16 years, specifically between 2009 and 2025, the Federal Government has spent billions of Naira on the airport’s runway expansion and repairs without a permanent solution.

Under former President Umaru Musa Yar’Adua, N4.13 billion was approved for upgrades, which included lengthening the runway from 2,400 to 3,000 metres and widening it to 60 metres.

By 2010, the project was revised under Yar’Adua’s successor, former President Goodluck Jonathan, who raised the contract to N10 billion to upgrade it to international status.

At the commissioning of the airport in 2013, Jonathan said another N13 billion would be required to complete the facility. However, there was no public record to show if the proposed sum was released or spent as a whole. Meanwhile, in 2013, a 600-metre extension was reportedly delivered.

Four years later, a Senate inspection in 2017 found the runway in poor condition. At the time, Mohammed Adamu, the senator representing Kebbi Central, said that over N9 billion had been earmarked for the terminal between 2015 and 2017.

In October 2019, former President Muhammadu Buhari also approved the release of a N10 billion Special Intervention Fund for immediate repairs and upgrade of the airport.

Nigerians react

With the latest closure of the airport over another runway problem, Nigerians have expressed their anger, with many demanding that the contractors be probed.

Those who took to X, formerly known as Twitter, included one Oluchukwu Madu, who stated: “How many times would government repair that Enugu Airport runway? Under the Buhari administration, the airport was shut down for months with the claim of repairing the runway? Why so much hatred for Easterners?”

Also sharing his thoughts, Udoka Christian, tweeted: “The day Tinubu probes Buhari over the reckless waste of resources in the aviation sector, Nigeria will beg for mercy. This is the same airport the former minister (Hadi Sirika) shut down for repairs for some months .”

Another X user, Legacytrend 1, said: “Why the same problem after one year of closure a few years ago? What happened to the contractor who did a poor job? Please, You should design and construct a second runway immediately so that you have an alternative in these situations because that is how decent societies work.”

Experts speak

Besides, industry analysts have also weighed in on the problematic runway, with many suggesting its reconstruction, which would take more than the allotted two weeks.

Setting the tone for their views, a former Rector of the Nigerian College of Aviation Technology, NCAT, Zaria, Captain Samuel Caulcrick, told our correspondent that the challenges with the runway were likely due to the underlying soil composition, which perhaps, he said could be causing structural issues and maintenance concerns.

Geotechnical assessments, others

He said: “This highlights the importance of geotechnical assessments. I hope they will conduct thorough soil assessments to inform infrastructure design and construction. Also, there is a need for specialised construction techniques. Panel-beating will be like kicking the can down the road. They should utilise construction methods tailored to the local soil conditions. Similarly, there should be regular monitoring and maintaining to prevent further deterioration. It is imperative to address these challenges to help ensure the safety and efficiency of air travel in Enugu.”

Assessment

Meanwhile, aviation analyst, Group Captain John Ojikutu, retd, argued that the latest repair would be the third major one.

Ojikutu said: “It is like they do repairs on that runway every five years. I remember asking the then Minister of Aviation, Stella Odua, when they upgraded it to an international airport, if they had done an assessment on the capacity of that airport to take large aircraft. As if I knew.

“I asked if they had done an assessment on the capacity of that airport, especially the runway and security. I was very emphatic about it. I also talked about the load classification number, in regard to the strength of the runway. The type of aircraft it was carrying that time was 737-200, not the 600 of today, and the F-27, the F-28. Those were the big aircraft they were carrying, apart from the military aircraft at that time, which was a very light aircraft anyway.”

The analyst said apart from those, there were no big aircraft going into that airport at that time.

Questions

He said: “So, when you just suddenly woke up and you wanted to start flying the bigger aircraft there, then the question that should have been asked was: would the strength of that runway be able to carry it? You did it the first time. You did it the second time. Something should tell you that there is a need for a different strategy.”

Ojikutu also asked: “How regular is what I call the periodic maintenance of that runway? How many landings do you have on that runway before it is being repaired? People just come and spend money.”

Reconstruction

On the way forward, he stated: “A reconstrucution should be done , otherwise it will reoccur. FG should do a reconstruction, upgrade the load classification number to be able to take the big aircraft that operates there. If any part of the runway ought to have a problem at all, it should be around the threshold – 200, 300 metres from the threshold – on both sides, because that is the area the aircraft is landing. Those are the areas that should be having problems. But when it’s having this type of problem regularly, then something should tell them what the problem is, and the solution is to reconstruct the runway.”

Tags
billionsEnugu airportRUNWAY NIGHTMARES
FacebookTwitterWhatsAppLinkedInEmailLink
Previous post Scandal! Osun monarch, pastor admit to COVID-19 fraud in US
next post Barcelona defeat Real Madrid 3-2 in extra-time to win Copa del Rey
Related posts
  • Related posts
  • More from author
Special

Spokesman of The Salvation Army, Ekong, celebrates 25 years marriage anniversary •PHOTO SPLASH

May 3, 20260
Special

EXPOSED: How dangerous ‘Tokunbo’ enter Nigeria roads •Unsuspecting Nigerians buy to their detriment

May 3, 20260
Special

Deaf, autistic girls battle unwanted pregnancies as randy men go berserk

April 11, 20260
Load more
Read also
Inside Akwa Ibom Today

inside the Hill top newspaper

February 9, 20250
News

I never promised to fix national grid in three months — New Power Minister Tegbe

May 8, 20260
Politics

Come seal our office if you can – Turaki-led PDP dares Wike

May 8, 20260
Crime

JUST IN: Finance commissioner facing N4.6 billion fraud charge gets court approval to travel to Saudi Arabia for Hajj

May 8, 20260
News

BREAKING: APC senatorial aspirant arrested after addressing supporters

May 8, 20260
Politics

Judges under pressure to abandon our cases – ADC

May 8, 20260
Politics

‘Tribal war’ in Lagos: APC chieftain vows to work against re-election of Igbo lawmaker

May 8, 20260
Load more

inside the Hill top newspaper

February 9, 2025

I never promised to fix national grid in three months — New Power Minister Tegbe

May 8, 2026

Come seal our office if you can – Turaki-led PDP dares Wike

May 8, 2026

JUST IN: Finance commissioner facing N4.6 billion fraud charge gets court approval to travel to Saudi Arabia for Hajj

May 8, 2026

BREAKING: APC senatorial aspirant arrested after addressing supporters

May 8, 2026

Judges under pressure to abandon our cases – ADC

May 8, 2026

inside the Hill top newspaper

0 Comments

I never promised to fix national grid in three months — New Power Minister Tegbe

0 Comments

5 burnt to death scooping fuel from fallen tanker

0 Comments

Naira slumps further as dollar scarcity bites harder

0 Comments

BREAKING: Appeal Court sacks Senate Minority Leader, orders election rerun

0 Comments

Again, Trump fined $10,000 for violating gag order

0 Comments

Follow us

FacebookLike our page
InstagramFollow us
YoutubeSubscribe to our channel
WhatsappContact us
Latest news
1

inside the Hill top newspaper

February 9, 2025
2

Messi wins FIFA Men’s Player of the Year Award

January 16, 2024
3

Anxiety over sudden change of payment platform by FG

March 4, 2025
4

Tinubu appoints new BOI board •FULL LIST

September 2, 2024
5

Meet Nigerian priest appointed as Vice Regent of Papal Household by Pope Leo •FULL PROFILE

November 11, 2025
6

Government officials shouldn’t embark on foreign trips until security is fixed – Peter Obi

January 17, 2024
Popular
1

inside the Hill top newspaper

February 9, 2025
2

Rwanda, Congo sign peace deal in US after rebel sweep

June 28, 2025
3

Nigerian workers to FG: Resolve issues with varsity lecturers in 4 weeks or face our wrath

October 20, 2025
4

Alleged plot to bomb National Assembly: Human rights lawyers Falana, Farotimi slam Reps

October 30, 2025
5

Alleged bribery: Court rejects APC national chairman Ganduje’s bid to stop trial

May 13, 2025
6

EPL: 10-man Chelsea edge out Brighton

December 4, 2023

About The Frontier

The Frontier is Nigeria’s leading online newspaper. It is published by Okims Media Links Limited headed by Sunny Okim, a veteran journalist who is widely known as The Grandmaster, fondly called so by colleagues and friends for being Nigeria’s pioneer movie journalist.

Most viewed

inside the Hill top newspaper

February 9, 2025

Ibadan Convention: Court verdict retains Turaki-led PDP NWC, says former Senate President Wabara

January 31, 2026

Several shops affected as fire guts 7-storey building in Lagos

August 16, 2024

Leaked sex tape: I apologise for my mistake – Popular social media personality, Sisi Alagbo begs fans

April 29, 2026

REVEALED: How Cabal withheld funds late former President Buhari approved for my office – Ex-National Security Adviser Monguno

December 17, 2025
Top posts

Categories

  • News4511
  • Politics3999
  • Crime3849
  • International2703
  • Sports2226
  • Business & Economy2101
  • Headlines2060
  • Education1232
  • Matilda Showbiz876
  • Health789
  • Entertainment720
  • Africa451
  • Religion442
  • Environment318
  • Special259
  • Arts & Culture226
  • Hunger protests in Nigeria224
  • Info Tech218
  • Interview175
  • Inside Akwa Ibom Today172
  • Opinion144
  • EyeCare with Dr Priscilia Imade115
  • Advert30
  • Epistles of Anthony Kila19
  • Trends16
  • Local News4

© 2026 The Frontier, Published by Okims Media Links Limited.

designed by winnet services

  • Home
  • Advertise with us
  • Contact