Skip to content
Saturday 7 November 2026
  • Home
  • Advertise with us
  • Contact
The Frontier
Click to read
The Frontier
  • News
  • Crime
  • Politics
  • Headlines
  • Education
  • Health
  • Business & Economy
  • Sports
  • More
    • International
    • Religion
    • Entertainment
    • Info Tech
    • Matilda Showbiz
      • Gists
      • Music
      • Gossips
      • Oga MAT
      • Romance
    • Arts & Culture
    • Environment
    • Opinion
    • Features
    • Epistles of Anthony Kila
    • EyeCare with Dr Priscilia Imade
The Frontier
  • News
  • Crime
  • Politics
  • Religion
  • Headlines
  • Education
  • International
  • Business & Economy
  • Entertainment
  • Sports
  • Arts & Culture
  • Environment
  • Health
  • Matilda Showbiz
    • Gists
    • Music
    • Gossips
    • Oga MAT
    • Romance
  • Opinion
  • Epistles of Anthony Kila
  • EyeCare with Dr Priscilia Imade
  • Info Tech
  • Interview
The Frontier
Click to read
News
News

Lagos-Calabar Coastal Highway has no single engineering design — Works minister Umahi

The FrontierThe FrontierOctober 23, 2026 1293 Minutes read0

•Umahi and Lagos-Calabar Coastal Highway

Nigeria’s Minister of Works, David Umahi, has said there is no single engineering design covering the entire 750-kilometre Lagos-Calabar Coastal Highway, explaining that detailed designs, environmental studies and soil investigations are being undertaken section by section as the project progresses.

Speaking in an interview on ARISE News, Umahi said misconceptions about the nature of the project had fuelled questions over its alignment, cost and environmental approvals.

SDP Poster Layout

“There is no one single design for the 750 km of Lagos-Calabar Coastal Highway,” Umahi said.

He explained that what existed before the Tinubu administration commenced construction was essentially a concept for a coastal route, rather than a completed engineering design for every kilometre between Lagos and Calabar.

“What was done in 2006 was a concept,” the minister said, explaining that the route had been gazetted but still required detailed engineering work before individual sections could be constructed.

According to Umahi, the government consequently carries out the necessary environmental and engineering studies for each section before proceeding with construction.

“You have to do the ESIA, you have to do the soil investigation, you have to do the engineering design,” he said.

Umahi said this section-by-section approach also meant that the government could not simply take the cost of the portion currently under construction in Lagos and multiply it across the entire 750 kilometres to arrive at a definitive cost for the highway.

He rejected claims that the entire project would cost about ₦15 trillion, questioning the basis on which such a figure had been calculated.

“Who fixed the ₦15 trillion?” Umahi asked, arguing that the terrain, engineering requirements and structures differ substantially from one section of the highway to another.

The minister said the federal government was procuring the project in sections and could therefore only determine costs as individual sections were designed and approved.

He pointed to the engineering differences already identified along the route, including bridges and difficult terrain, as evidence that a uniform per-kilometre cost could not reasonably be applied across the entire highway.

Umahi also addressed questions surrounding the Environmental and Social Impact Assessment for the project, insisting that an ESIA did not have to be completed as a single document covering all 750 kilometres before construction could begin.

“There is no single ESIA for the entire 750 kilometres,” he said, explaining that provisional environmental assessments are undertaken for the relevant sections before work begins, with the process continuing as designs are finalised.

That phased approach is consistent with an explanation given by Minister of State for Environment Iziaq Salako in an ARISE News interview in May 2024.

Salako said at the time that because of the length of the highway, environmental certification would be undertaken in phases and that preliminary approval had been issued for initial works.

Umahi said Section One now had its full environmental assessment and maintained that the government was complying with the required environmental processes as construction progressed.

The minister’s explanation comes amid renewed scrutiny of the highway’s route through the Niger Delta following controversy over whether portions of the original coastal alignment had been abandoned in favour of the existing East-West Road.

The federal government has since insisted that the 750km alignment remains intact and that the proposed reconstruction of about 400 kilometres of the East-West Road is an additional project rather than a replacement for the Coastal Highway. It has also said survey and design work remains underway on outstanding portions through Edo, Delta, Bayelsa and Rivers.

Umahi similarly insisted in the interview that the Coastal Highway remained a 750-kilometre project despite the fact that detailed designs for all portions were not completed simultaneously.

He said the government’s approach was to design, procure and construct individual sections as the necessary engineering and environmental work was completed.

Tags
engineering designLagos-Calabar coastal highwayWorks Minister Umahi
FacebookTwitterWhatsAppLinkedInEmailLink
Previous post Security operatives guard Tinubu’s billboards ahead election campaign launch tomorrow
next post State Police: 24 states approve bill •FULL LIST
Related posts
  • Related posts
  • More from author
News

JUST IN: Black box recovered from aircraft crash site in Ondo

November 6, 20260
News

REVEALED: Real reason Nigerians are getting fewer hours of electricity — System operator

November 6, 20260
News

IPOB demands release of detained Igbo men, alleges persecution

November 6, 20260
Load more
Read also
Inside Akwa Ibom Today

ARISE Projects Impact

February 9, 20250
Sports

Osimhen sustains knee injury, to miss Nigeria’s AFCON qualifiers

November 6, 20260
Crime

Four suspects in Police net over murder of 50-year-old man

November 6, 20260
Africa

Kenyan preacher sentenced to 200 years in prison over child murders

November 6, 20260
Politics

More trouble for ADC as chairmen threaten protest, demand David Mark’s removal

November 6, 20260
International

UK criminalises keeping children abroad without consent

November 6, 20260
Sports

Coach Carrick insists Man Utd can recapture former glories

November 6, 20260
Load more

ARISE Projects Impact

February 9, 2025

Osimhen sustains knee injury, to miss Nigeria’s AFCON qualifiers

November 6, 2026

Four suspects in Police net over murder of 50-year-old man

November 6, 2026

Kenyan preacher sentenced to 200 years in prison over child murders

November 6, 2026

More trouble for ADC as chairmen threaten protest, demand David Mark’s removal

November 6, 2026

UK criminalises keeping children abroad without consent

November 6, 2026

ARISE Projects Impact

0 Comments

Osimhen sustains knee injury, to miss Nigeria’s AFCON qualifiers

0 Comments

5 burnt to death scooping fuel from fallen tanker

0 Comments

Naira slumps further as dollar scarcity bites harder

0 Comments

BREAKING: Appeal Court sacks Senate Minority Leader, orders election rerun

0 Comments

Follow us

FacebookLike our page
InstagramFollow us
YoutubeSubscribe to our channel
WhatsappContact us
Latest news
1

ARISE Projects Impact

February 9, 2025
2

Edo governorship election tribunal: Why we’re sure of victory – PDP

February 4, 2025
3

Gov Okpebholo’s Supreme Court victory, triumph of democracy, Edo people’s will — Akpabio

July 11, 2025
4

2027 elections: Only legislative intervention can tackle concerns raised by Muslims over Ramadan – INEC

February 14, 2026
5

Emergency rule: Rivers Sole Administrator Ibas begins transition back to democratic govt

September 13, 2025
6

Nigeria veering toward absolute rule — Former Vice President Atiku warns

March 24, 2026
Popular
1

ARISE Projects Impact

February 9, 2025
2

2027: Tinubu’s loyalists regroup, revive structures

August 4, 2025
3

2027: Former President Jonathan ready to run again – Close ally confirms

August 7, 2025
4

ADC holds convention tomorrow, releases fresh committee list

April 13, 2026
5

Pharmaceutical Society of Nigeria raises alarm over pharmacist shortage, demands govt intervention

May 5, 2026
6

Terrorism: Foreign armed group luring our youths with N1 million – Council chairman

November 5, 2024

About The Frontier

The Frontier is Nigeria’s leading online newspaper. It is published by Okims Media Links Limited headed by Sunny Okim, a veteran journalist who is widely known as The Grandmaster, fondly called so by colleagues and friends for being Nigeria’s pioneer movie journalist.

Most viewed

ARISE Projects Impact

February 9, 2025

Afrobeats sensation, Davido pulls out of London show over dispute with organiser

June 15, 2025

Church leaders must speak against terrorism, banditry in Nigeria – Bishop Fagbohun

January 3, 2026

World Cup blends football with global music stars

June 11, 2026

Haaland a doubt for Man City showdown with Liverpool

February 21, 2025
Top posts

Categories

  • News5220
  • Politics4996
  • Crime4709
  • International3297
  • Sports2647
  • Business & Economy2409
  • Headlines2307
  • Education1466
  • Matilda Showbiz1062
  • Health985
  • Entertainment905
  • Africa628
  • Religion509
  • Environment412
  • Special279
  • Info Tech272
  • Arts & Culture246
  • Inside Akwa Ibom Today245
  • Hunger protests in Nigeria224
  • Interview202
  • Opinion161
  • EyeCare with Dr Priscilia Imade140
  • World Cup 202695
  • Advert36
  • Trends25
  • Epistles of Anthony Kila19
  • Local News5
  • The Surge4

© 2026 The Frontier, Published by Okims Media Links Limited.

designed by winnet services

  • Home
  • Advertise with us
  • Contact